Resource allocation in design and construction
Contents |
[edit] Introduction
Resource allocation is a business term that describes the assignment of people, materials, plant and other resources to specific projects, tasks or other uses. In design and construction terms, resource allocation can be used to describe the process of assigning people, materials, tasks and so on based on availability and scheduling requirements.
Also see Resource management.
[edit] Proper resource allocation
It is important to determine if the correct number and mix of people are available to be able to deliver the work that has been accepted. Having adequate resources in place to provide clients with a professional service is a requirement of both the ARB and RIBA codes.
Problems with projects can occur where there is poor resource allocation. These difficulties have become more prevalent as buildings have become more technical, the range of products and materials has increased, standards and regulations have become more strict, and there are a greater number of specialist designers, particularly in the early stages of the design process.
To reduce these issues, resource allocation should be pre-planned and, where appropriate, allocated to the specific tasks. Properly scheduling the available resources is crucial in ensuring that the project proceeds correctly and within the established timeframe and budget.
If resources are limited, this can sometimes result in conflicts that can be addressed using allocation methods. Allocation ensures that the resources required do not exceed those available, but on the condition that any resulting delay is kept to a minimum.
Also see Resource leveling.
[edit] Algorithms for resource allocation
Practical problem solving approaches such as the Wiest-Levy method for resource allocation are commonly used and can provide good solutions relatively quickly.
The Wiest-Levy method is based on the scheduling of activities which can be carried out using the resources available. When the load is greater than the available resource, the activity will have to be delayed; amongst the most non-critical activities, the one that solves the problem with the least delay is chosen. If there are two activities with the same conditions, the one with the greatest float is delayed first, meaning that critical activities are only delayed when there is no other option.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.