Resource allocation in design and construction
Contents |
[edit] Introduction
Resource allocation is a business term that describes the assignment of people, materials, plant and other resources to specific projects, tasks or other uses. In design and construction terms, resource allocation can be used to describe the process of assigning people, materials, tasks and so on based on availability and scheduling requirements.
Also see Resource management.
[edit] Proper resource allocation
It is important to determine if the correct number and mix of people are available to be able to deliver the work that has been accepted. Having adequate resources in place to provide clients with a professional service is a requirement of both the ARB and RIBA codes.
Problems with projects can occur where there is poor resource allocation. These difficulties have become more prevalent as buildings have become more technical, the range of products and materials has increased, standards and regulations have become more strict, and there are a greater number of specialist designers, particularly in the early stages of the design process.
To reduce these issues, resource allocation should be pre-planned and, where appropriate, allocated to the specific tasks. Properly scheduling the available resources is crucial in ensuring that the project proceeds correctly and within the established timeframe and budget.
If resources are limited, this can sometimes result in conflicts that can be addressed using allocation methods. Allocation ensures that the resources required do not exceed those available, but on the condition that any resulting delay is kept to a minimum.
Also see Resource leveling.
[edit] Algorithms for resource allocation
Practical problem solving approaches such as the Wiest-Levy method for resource allocation are commonly used and can provide good solutions relatively quickly.
The Wiest-Levy method is based on the scheduling of activities which can be carried out using the resources available. When the load is greater than the available resource, the activity will have to be delayed; amongst the most non-critical activities, the one that solves the problem with the least delay is chosen. If there are two activities with the same conditions, the one with the greatest float is delayed first, meaning that critical activities are only delayed when there is no other option.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.